New SSB Batch starts on every Monday.

Written batches for CDS/NDA/AFCAT/TA/CAPF/SSC runs every month

Shashwat Tiwari

AIR 5

NDA 145 Entry

Kuldeep kumar

AIR 6

NDA 145 Entry

SSB
Coaching
Register Now

Written
Exam Coaching
Register Now

SPARSH KANKANE

AIR 1 in Merit List

NDA 142 Entry

SIDDHARTH BHARTI

AIR 2 In the Merit List

Army Tech Entry

New SSB Batch starts on every Monday.

Written batches for CDS/NDA/AFCAT/TA/CAPF/SSC runs every month

🛤️ A Dream Now on Rails!

The Udhampur–Srinagar–Baramulla Rail Link (USBRL) is more than a train route — it’s a historic, strategic, and engineering marvel that now connects the Kashmir Valley to the rest of India! 🇮🇳

🎯 Boosts: Trade 📦 | Tourism 🧳 | Economy 💰


🕰️ A Glimpse into the Past: The Early Railway Story of J&K

🚉 1897: First rail line by the British – Jammu to Sialkot (now in 🇵🇰)

📜 1902–1905: Maharaja Pratap Singh backed the Jammu–Srinagar line via Reasi (not built)

1947 Partition: Sialkot became part of Pakistan, cutting off Jammu

🚂 1975: Pathankot–Jammu line inaugurated – reconnecting J&K after decades

🔧 1983–2004: Jammu–Udhampur (53 km) took 21 years to complete


🏗️ USBRL Project: From Vision to Victory

📅 Launched: 1994

🟢 Approved: 1995 as a National Project

💸 Cost: ₹43,780 crore (initial estimate ₹2,500 crore!)

✅ Now fully complete! Katra ↔️ Srinagar in just 3 hours (half the time by road!) 🕒

🚄 2 Vande Bharat Trains flagged off by PM 🇮🇳 — first snow-ready VB in India!


🧭 Route & Sections – 272 km of Brilliance

🌉 943 Bridges, 🕳️ 36 Tunnels, ⛰️ Cutting across the Himalayas!

🔹 1. Udhampur–Katra (25 km) – Operational since 2014

🔹 2. Katra–Banihal (111 km)

🔹 3.Sangaldan–Banihal (48 km) – Operational in 2024

🔹 4. Katra–Sangaldan (63 km) – Inaugurated on June 6, 2025

🔹 5. Banihal–Baramulla (136 km)

🔹 6. Qazigund–Baramulla: Phased opening from 2009–2013


❄️🚅 Features That Define Innovation

✅ All-Weather Operation even in -20°C ❄️

🔥 Heated windshields, 🛁 insulated toilets, & advanced heating systems

🌍 SEISMIC DAMPERS: Built for Zone V earthquake zones

⚡ Fully Electrified = Eco-Friendly & Efficient 🌱⚡


🌉🏞️ CHENAB BRIDGE – The Crown Jewel!

🌍 World’s Highest Railway Arch Bridge

📏 Height: 359 m above the riverbed

📐 Arch Length: 467 m, Total Length: 1,315 m

🌪️ Withstands: 220 km/h winds + Earthquakes (8.0 magnitude)

💥 Blast-proof: Survives 40 tonnes TNT 💣

🕰️ Lifespan: 120 years!

🧵⚙️ ANJI KHAD BRIDGE – India’s First Cable-Stayed Rail Bridge



📍 Location: Reasi, J&K

📏 Height: 331 m above Anji River Valley

🪢 Cables: 96 (length: 82–295 m), Span: 473.25 m

🗼 Main Pylon: 193 m tall

🌉 Total Length: 725.5 m

🚇🇮🇳 India’s Longest Transport Tunnel

📍 Location: Ramban District

📏 Length: 12.77 km – a record-breaking feat!


🌿⚡ Going Green

🚆 J&K rail network is now 100% Electrified!

🔋 A major move toward sustainable, energy-efficient transportation in the Himalayas!


📣 Why It Matters

This isn't just a train — it’s hope on tracks, a lifelin

e for Kashmir, and a symbol of India’s engineering brilliance & commitment to inclusive development! 🇮🇳💪

Surender kumar

Rahul Kumar

NDA 155 entry

Garvit kumar

NDA 155 entry

Hrudhyanath M G

NDA 155 entry

Ayush kumar

AFCAT entry

Rohan Tanwar

SSC tech entry

Tripti tyagi

CDS (OTA) entry

Yuvraj singh

CDS entry

Kritika Mishra

AFCAT entry

Rayn Mukharjee

NDA entry

Ayush Mishra

TES entry

Himanshi

NDA Entry

Follow Us



WhatsApp chat WhatsApp chat